Recently, We delivered a batch of EV capacitors for city trolleybus. Now the trolleybuses hit the road and carry passagers.
The car’s power is coming from the build-in power battery and the power provided by wire network. This trolleybus not only save the trouble of setting up charging pile, but also solve the problems about long charging time and hard to replace battery by using power grid to charge during operation for the pure electric bus . Save both time and labor, not to mention the cost reduction.
As a quality supplier, CRE provided a combined capacitors including 3 different types of EV capacitors. Each has different terminals and complex production process. This combination has high resistance to high voltage and self-healing, was widely used in EV and HEV. It enhances the safety of tram and passengers, and has the characteristics of good safety and high stability.
The delivered trolleybus is designed to be isolated by using DCDC system. The power system has been applied due to its advanced technology and stable performance.
Its isolated power supply provided is a fresh new product. With the technology from Germany, It can improved the performance of power, economic and safety on the basis of meeting working requirements. Thus the problem against passengers,vehicles and power grid will be solved fundamentally.
Meanwhile, the DCDC isolated system not only greatly improved the supply/charging efficiency, but also extend the service life of on-board energy storage device. Especially the high-frequency transformer isolation technology that reduces the isolated material of auto electrical.
As it well-know that new energy vehicles will be the future for sure. Not only private cars, but also the public transport system has gradually taken the development of new energy as a key direction of development.
With many years experience in film capacitor production business, CRE is willing to cooperate with more excellent partners. Let’s provides strong support for the earth’s environment and clean energy together.
For further information, please contact us.
Post time: Nov-10-2020