After the epidemic in China was brought under control last year, manufacturing capacity was fully restored. But the global epidemic has been slow to die down, and this year another manufacturing base in Southeast Asia has not been able to carry the load and “fallen” under the ravages of the Delta virus, so in fact the current global orders will inevitably converge on China. However, in September last year, the Chinese government has officially announced that China aims to reach peak emissions before 2030 and achieve carbon neutrality before 2060, which means that China only has 30 years for continuous and rapid emissions cuts. To build a community of common destiny, the Chinese people have to work hard and make unprecedented progress.
Chinese local governments have taken strict-ever actions to reduce release of CO2 and energy consumption by restricted supply of electricity power.
In the face of the current severe situation of dual control of energy consumption in China, CRE’s manufacturing operation has been adjusted accordingly. However, we will do our best to ensure the on-time production and guarantee the quality to minimize the impact of this capacity restriction. Our production capacity will be restored as soon as the tight local power supply situation eases.
Post time: Oct-19-2021